
STS-45 Patch
STS-45 Patch Launch Highlights The launch was originally scheduled for March 23, but was delayed one day because of higher than allowable concentrations of liquid hydrogen and liquid oxygen in the orbiter’s aft compartment during tanking operations. During troubleshooting, the leaks could not be reproduced, leading engineers to believe that they were the result of plumbing in the main propulsion system not thermally conditioned to the super cold propellants. Launch was rescheduled for March 24. Mission Highlights The mission carried the first Atmospheric Laboratory for Applications and Science (ATLAS-1) on Spacelab pallets mounted in the orbiter’s cargo bay. The non-deployable payload, equipped with 12 instruments from the U.S., France, Germany, Belgium, Switzerland, the Netherlands and Japan, conducted studies in atmospheric chemistry, solar radiation, space plasma physics and ultraviolet astronomy. ATLAS-1 instruments were: Atmospheric Trace Molecule Spectroscopy (ATMOS); Grille Spec