STS-38 Patch

STS-38 Patch

$6.95
{{option.name}}: {{selected_options[option.position]}}
{{value_obj.value}}

STS-38 Patch Launch Highlights The launch was originally scheduled for July 1990. However, a liquid hydrogen leak found on the orbiter Columbia during the STS-35 countdown prompted three precautionary tanking tests on Atlantis at the pad on June 29, July 13 and July 25. Tests confirmed a hydrogen fuel leak on external tank side of external tank/orbiter 17-inch quick disconnect umbilical. This could not be repaired at the pad and Atlantis rolled back to the VAB on August 9, was demated and transferred to the OPF. During rollback, the vehicle parked outside the VAB about a day while COLUMBIA/STS-35 stack was transferred to the pad for launch. Outside, Atlantis suffered minor hail damage to tiles during a thunderstorm. After repairs were made in the OPF, Atlantis was transferred to the VAB for mating on October 2. During hoisting operations, a platform beam that should have been removed from aft compartment fell and caused minor damage which was repaired. Vehicle rolled out to Pad A on Oc

Show More Show Less