Flowline Anode

Flowline Anode

$99.00
{{option.name}}: {{selected_options[option.position]}}
{{value_obj.value}}

Increase the life of your equipment with our flowline anode. The flow line anode is molded on to a sub and features a bull plug with line pipe threads on one end and a diffuser on the leading end. The flow line anode is installed inside a flow line T at a location where the fluid is forced through a 90° bend.  The run life of the anodes depend greatly on the amount of corrosion present, and the number of anodes installed in a specific location should be adjusted accordingly. 

Show More Show Less